Raising the pylon including rigging

WORK SCOPE

  • Omexon requested Debru Projects to raise a pylon
  • Assignment/engineering concept
  • Hoisting the complete HV tower including conductors and fixtures
  • Planning and realisation of the temporary access road to protect the existing infrastructure
  • Restoring the project site to its original state. That is:  replanting trees and bushes, restoring the temporarily removed infrastructure and inspecting the sewerage for subsidence.

RESULT

Due to the construction of a heavy-duty temporary access road in a densely built-up area, Debru was able to raise the scheduled HV tower using a smaller type of crane, and the work was implemented with minimum impact on the environment and the existing infrastructure.