Installation work method for insulated cross-arms

WORK SCOPE

  • Project preparation (scheduling and calculation)
  • Calculation and coordination (pre-) installation
  • Calculation and coordination of hoisting
  • Project management
  • Prefabrication in the cradle and minimalize working at height

RESULT

Omexon requested Debru Projects to develop the most efficient installation method for installation of the insulated pylon crossarms. All cross-arms were preassembled on ground level in custom developed cradles. 

The method improved efficiency so the crane and manpower could be used cost-effectively to the full extent (saved costs). Installation was handled within a very limited term.