Omexon requested Debru Projects to develop the most efficient installation method for installation of the insulated pylon crossarms. All cross-arms were preassembled on ground level in custom developed cradles.
The method improved efficiency so the crane and manpower could be used cost-effectively to the full extent (saved costs). Installation was handled within a very limited term.